Clash-free models from design to handover
MEP coordination from RIBA Stage 3 to Stage 6 - ISO-compliant, COBie-ready, and integrated into your CDE from day one.
Explore Service →Full MEP coordination across RIBA Stages 3 to Stage 6
Coordinated models that reduce risk and save programme time
CDE system management and team training included
COBie, NRM, and Uniclass compliant data deliverables
02
Precise site data for complex environments
Laser scanning, drone surveys, and Scan-to-BIM - capturing over 10 billion points in 2024 alone across hospitals, pharma, and infrastructure.
Explore Service →High-resolution capture for operational environments
Aerial mapping for expansive or hard-to-reach sites
Point clouds to information models or reality meshes
Site data feeding directly into FM systems
03
Prefabrication-ready designs reducing site risk
Pipe spools, plant skids, M&E modules, and prefabricated plant rooms - designed offsite and integrated into your BIM model. 15–25% programme savings on average.
Explore Service →Pipe spools, plant skids, M&E modules, plant rooms
Optimised processes reducing on-site challenges
Seamless design-to-manufacturing compatibility
15–25% average time savings through prefabrication
04
Programme certainty built into your BIM model
Construction timelines embedded directly into BIM - simulating project progress, resolving conflicts before they occur, and keeping all stakeholders visually aligned.
Explore Service →Construction timelines embedded in BIM models
Coordinated models that reduce risk and save programme time
Visual walkthroughs improving communication
Sequence simulation catching issues in advance
05
Structured data for seamless FM handover
COBie-compliant deliverables, NRM and Uniclass data authoring, and FM system integration - structured asset data that works from handover through the full operational lifecycle.
Explore Service →Structured, compliant data for seamless handovers
Models linked with operational FM tools
Insights and updates maintaining asset performance
15–25% average time savings through prefabrication
06
Buildable design input from site experience
Practical MEP, public health and process input that strengthens consultant and contractor designs before work reaches site.
Explore Service →Practical engineering input across MEP disciplines
Designs and models checked with a builder's eye
Systems that can be reached, serviced and replaced
Drainage, water services and process pipework covered
07
Cost certainty from the coordinated model
Quantities taken straight from the BIM model, consultant estimates validated and NEC information duties made practical.
Explore Service →Quantities taken directly from the coordinated model
Consultant estimates cross-checked against the model
Option X10 and NEC3 information management guidance
Structured to drop straight into a bill of quantities