Integrating time into your BIM models for enhanced visualisation, identifying conflicts and inefficiencies before they reach site and improving communication across every stakeholder.

Integrating time into your BIM models to identify conflicts and inefficiencies before they reach site

Programme certainty from day one

Visual walkthroughs for stakeholders

All staff DBS-checked

What we do

Programme sequencing embedded directly into your BIM model

DEW embeds construction timelines within your coordinated BIM model, simulating project progress stage by stage so teams can visualise how the build sequence unfolds long before work reaches site.

This dynamic scheduling approach identifies potential clashes and sequencing inefficiencies early, reducing programme risk and supporting more confident decision-making across the project team.

Visual walkthroughs generated from the 4D model improve communication with clients, contractors and stakeholders, making complex phasing easy to understand at a glance.

Dynamic Scheduling Conflict Resolution Stakeholder Engagement Visual Walkthroughs

At a glance


Standards

ISO 19650 information management

buildingSMART IFC classification


Core capabilities

Three areas of focus within every 4D engagement

Dynamic Scheduling

Timelines embedded within the model


Embedding construction timelines within BIM models to simulate project progress.

Stage-by-stage progress simulation

Conflict Resolution

Catching issues before they reach site


Identifying potential clashes and inefficiencies before they occur.

Reduced programme risk

Stakeholder Engagement

Visual clarity for every stakeholder


Providing visual walkthroughs to improve communication and decision-making.

Improved decision-making at every stage

“

DEWorks offer an excellent, totally professional service, with outputs to match. Costs are competitive, and reliability is second to none.

Director of Digitalisation

– ADI Group

Project Case Study

Blindwells School
New Education Facility

Overview

Blindwells School required BIM coordination and COBie-compliant deliverables for a new two-level educational facility.

Key Deliverables


Common questions

FAQ

Have a question not answered here? Our team is happy to talk through your specific requirements.

Ask us a question →
What software do you use for 4D scheduling?

We work primarily in Synchro and Navisworks for 4D sequencing, integrating programme data from planning tools such as Asta Powerproject and Primavera P6. We've also developed our own in-house tools for programme and 4D workflows – so if your project has an unusual requirement, we can usually build around it rather than force a workaround. 

A traditional programme is a list of dates; a 4D model shows what those dates actually look like in the building. By linking every programme activity to the model geometry, the build sequence becomes something you can watch, interrogate, and pressure-test – making sequencing clashes, access conflicts, and logistics problems visible while they're still cheap to fix.

A full programme helps but isn't required to begin. We can start with an outline programme or key milestones and refine the 4D sequence as more detailed scheduling information becomes available, updating the model as your programme develops.

The biggest value comes early – at tender or pre-construction stage, when sequencing decisions are still open and a visualised programme can strengthen a bid or de-risk mobilisation. But 4D also earns its keep mid-project, particularly when re-sequencing after a delay or planning a complex phase.

Yes – it's one of the strongest use cases. On live environments such as operational hospitals, phasing, access routes, and isolation of work areas can be simulated and agreed with stakeholders before anyone mobilises, keeping disruption to day-to-day operations to a minimum.

Yes – the visual walkthroughs generated from the 4D model are designed to be accessible to non-technical audiences. They present construction sequencing as a clear, visual timeline rather than technical scheduling data, making them well suited to client presentations and stakeholder briefings.

Related services

Services that complement 4D planning

Reality capture

Laser scanning & scan to BIM

Accurate existing conditions from laser scanning and drone surveys, feeding straight into BIM coordination.

View service →

BIM / AIM Coordination

COBie, Digital Twins & FM handover

The coordinated model that every fabrication drawing is checked against.

View service →

DfMA

Prefabrication-ready designs

Pipe spool and plant skid drawings, prefabricated plant room design and offsite manufacturing support, reducing risk on site.

View service →

WORK WITH DEW

Ready to talk about your next project?

DEW integrates directly into your project team, building programme certainty into your BIM model from day one.